HVAC PAD Project BOM
Project Item/Phase Man Requirements Material Requirements Machinery/Tools
Engineering (Drawing) - Design engineers (2)
- CAD operators (3)
- QA/QC engineer (1)
- AutoCAD licenses
- Revit software
- Design specifications
- CAD workstations
- Plotter/printer
- 3D modeling software
Procurement (AC Components) - Procurement officers (2)
- Logistics coordinator (1)
- Compressors
- Condenser coils
- Refrigerant piping
- Inventory management system
- Barcode scanners
Purchase (Sheet Metals) - Purchasing officer (1)
- Quality inspector (1)
- Galvanized steel sheets
- Insulation materials
- Fasteners
- Material handling equipment
- Thickness gauges
Manufacturing (Duct Work) - Sheet metal workers (4)
- Welders (2)
- Supervisors (1)
- Pre-cut duct sections
- Gaskets
- Sealants
- CNC duct machines
- Plasma cutters
- Press brakes
Construction - HVAC technicians (5)
- Crane operators (2)
- Structural supports
- Vibration isolators
- Insulation
- Mobile cranes
- Scaffolding
- Welding machines
Erection - Riggers (3)
- Safety officers (1)
- Anchor bolts
- Lifting slings
- Temporary bracing
- Tower cranes
- Hoists
- Laser alignment tools
Commissioning - Commissioning engineers (2)
- Technicians (3)
- Calibration equipment
- Testing instruments
- Airflow testers
- Vibration analyzers
- Thermal cameras